Slide the flashing in and line it up so that the bent angle runs parallel to the overhang.
How to extend your roof line.
Keep the roof and roof line clean.
I am adding an extendtion to an existing 12x12 shed to make it 12x16.
Get up on your roof or scaffolding.
Take the longer flat side of the flashing and gently slide it in between the first row of shingles and the roof.
Yes where you live does make a difference.
The way you need to build will change the cost.
The cost of labor for your region.
The idea is to draw up what you want to build.
Gutter guards are a good idea but it doesn t stop there.
How do i extend roof line.
Will where i live make the cost of extending a roof overhang change.
15 00 20 00 finishing the interior.
Some will want to work with you off of your drawings.
19 00 32 00 siding and roofing materials installed.
Keeping it in line with the original roof.
Slide your first sheet of flashing under the first layer of shingles.
3 25 4 50 framing the dormer.
50 00 110 00 the higher cost per square foot to frame side and roof dormers compared to additions is due to their smaller size.
Removing roof material and cutting the roof deck.
How do i attach the roof to the original roof line.
With your proposal an office visit to an engineer would be a good thing to get things started.
If you live in a wind load or snow load region makes a difference.
I live in a heavy snow load area and we build.
If you re adding to the gable end of the house the side wall that goes up to the roof s peak it s fairly easy to extend the existing roofline over the new space says curt schultz a realtor architect builder in pasadena calif.
To get this permitted your permitting office will likely require your plans be stamped by a structural engineer.
The cost of materials for your region.