Make exact measurements ensure.
How to fur a concrete wall.
With a pencil or a.
With a pencil or a marker draw vertically lines from.
Mark the wall for vertical furring strips installed 16 inch on center.
How to frame poured walls.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
Tapcon concrete screw installation.
Whether poured or block built properly a concrete wall is strong and will not rot warp or invite termites and other.
Clear the holes of all.
Now repeat this process at the top of the wall.
Use chalk to draw the lines and a straight edge as a guide.
You can t deny that concrete walls are efficient.
Determine the desired position of the furring strips or 2x4s before drilling any holes.
These markings will indicate where you will vertically attach your.
Step 2 place the first furring strip over a vertical line.
Using the level plumb down the wall and draw a line for reference.