Installing ice and water shield roofing text.
How to install ice guard on roof.
Once in place follow by flashing the rakes.
Of sheet is strips of the membrane can also be used as stripping.
For example a 4 12 roof that is 50 feet from eave to ridge with a 40 psf design roof snow load will exert 633 pounds per linear foot of eave on the snow guard assembly he explains.
Ice and water protector needs to be installed directly onto the roof deck after you have placed the drip edge at the eave.
Install waterguard rain ice first in roof valleys see instructions below and as a flashing membrane at roof to wall transitions around vents curbs skylights and other roof penetrations.
Press the glued end of the snow guard along the first mark on the roof until the adhesive seeps out from underneath.
This ice shield seals nail holes better then regular tar paper roofing materials.
Bruce asked me the following question.
Then apply along the eaves.
Wipe the excess glue from around the guard with your finger.
Place the guard so the vertical edge faces up the slope of your roof.
Then install regular roofing underlayment tar paper over the top of the drip edge and over the ice barrier and continuing all the way up the roof.
Install the ice barrier membrane according to the manufacturer s instructions with the drip edge installed on top of the membrane.
If the slope of the same roof is changed to 7 12 the force changes to 1 008 pounds per linear foot.
The drip edge will be installed over the ice and water protector and other underlayments at roof rake edges you should install ice and water protector before other underlayments including roof felt.
This ice water shield is applied as an underlayment prior to putting the shingles on the roof.