The drip edge will be installed over the ice and water protector and other underlayments at roof rake edges you should install ice and water protector before other underlayments including roof felt.
How to install ice shield on roof.
Installing ice and water shield roofing text.
Then install regular roofing underlayment tar paper over the top of the drip edge and over the ice barrier and continuing all the way up the roof.
If installed properly this reliable roofing underlayment can save homeowners 18 000 in reroofing costs.
Peel back 300 600 mm 1 2 ft of release liner align membrane.
Begin at a lower corner of roof parallel to the eave and flip the whole sheet over so the adhesive side with release film faces up.
Cut waterguard rain ice to a convenient length and dry fit the membrane to the roof before removing the release film.
Cut the membrane into 3 5 m 10 15 ft lengths and re roll loosely.
Ice and water protector needs to be installed directly onto the roof deck after you have placed the drip edge at the eave.
Install the ice barrier membrane according to the manufacturer s instructions with the drip edge installed on top of the membrane.
Peel both sides of the release film completely off.