Install peel and stick roofing in a similar manner.
How to install roll shingle roofing.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
Mark a chalk line to identify the end of your first layer.
Apply roofing cement to the roof.
The strips should always be horizontal.
Cut the rolled roofing.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Spread the roofing cement along the.
It also helps if you first install a layer of roofing felt.
Every 5 inches make a new mark until you get to the rop of the roof.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
It not only protects the roof but it also protects the fascia.
How to do it attach first course.
Plan so that no two butt joints are closer than 2 feet from each other.
For extra durability you may install roll roofing in two layers.
To seal a plumbing vent spread roofing.
Drip edge or drip cap is either plastic or sheet metal.
Repeat this on both sides of the roof.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Installing the rolled roofing 1.