How to install roof felt and drip edge.
Does the drip edge metal go under the tarpaper ice and water shield or underlayment on the eave.
Does drip edge go over or under felt.
In this video i just show a quick install of some drip edging and how to cut corners.
Install drip edges on the eaves first.
Make sure the outer edge extends over the gutter.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
If it doesn t pull the drip edge out slightly from under the shingles.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
But over the underlayment along the rake edges of the roof.
According to most building codes and manufacturer recommendations the drip edge should be installed beneath the underlayment along the eaves of the roof.
Nail it in place with 1 inch roofing nails.
As always thanks for watching.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Secure the drip edge with roofing cement.
Find and fix a leaking roof step 2.
Catch you on the next one.
Install the drip edge tightly against the edges of the plywood sub roofing so that it hangs down over the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
12 roof repair tips.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
Place the drip.
Cut a length of drip edge when needed with a pair or tin snips.
Understanding the proper way to install the drip edge will only get you so far.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.