Also cover up with long sleeved clothing to reduce the chances of an accident.
How to install torch on roofing felt.
Cold process modified bitumen roll roofing is another way to apply rolled roofing other than hot mopping or torching.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Installing roof felt is a two person job.
Fasten drip edge on eaves with.
Overlap each row at least 3 to 4 inches.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Watch this video if you want to learn how to use a propane torch on a flat roof.
Using your staple gun secure the felt to the roof.
You will need to use your gloves and boots on occasion to roll or press down on the bitumen sheets as they bubble.
Hang the lower edge of the felt over the eave the part of the roof that meets or overhangs the shed s walls by about 0 5 to 0 75 inches 1 3 to 1 9 cm.
Never install the felt vertically across your roof.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Some roofing felts are actually glued down.
This will help you get started and you will also learn some tricks.
Installing the torch down roofing involves flames and melted asphalt.
Installing the roofing felt does take care but can go very quickly.
Start by laying asphalt felt or other underlayment over the roof.
The term cold applied is referring to o.