Tiles are then laid out across the roof and clipped on.
How to lay roof tiles australia.
For specialist services please view the find a roofing specialist.
Where the different sides of the roof meet.
How to tile a roof if you would prefer to read how to tile a roof and see more help please visit this link unless you found this video via my website.
Despite being over 40 years old this hardwood roof was still mostly in good condition.
Putting on the tiles.
This is on its own a major job that can take days and require special tools.
Construction usually takes around 1 2 days to get a concrete or terracotta tile roof installed and 1 day for a composite tile roof.
Remove old roofing if applicable.
The original battens were left to maintain structural integrity and new 70 x 35mm pine battens secured to.
Position the first.
With straight bond the sides of tiles form straight lines from bottom to top course.
They were formed into the shape of 5 tiles and coated with a bitumen coating with a fine stone aggregate embedded in the coating.
They are galvanized steel pressed metal roofing sheet which were popular in the 1970 s 1980 s as a roofing material.
Removing tiles can be slow as they can be nailed or wired down.
You can see in the photo the bitumen coating and their resemblance to a cement roof tile.
Repair and reinforce the roof if applicable.
After a section of tile was removed the timber ridge rafters and battens were inspected and checked for level.
With staggered broken or cross bond tiles in each alternate course overlap by half the tiles above and below them.
Tiles at the edges are cut to make even lines along the hips and valleys of the roof i e.
The system of aligning tiles on the roof in relationship to each other.