Install the first length of z flashing.
Installing z bar flashing on siding.
This weather strip comes in plastic or galvanized metal.
Complete the installation of the first horizontal row of t1 11 siding following standard construction practices.
How to hang heavy frame with z bar hanger.
How to install z flashing on t1 11 siding.
Cut half inch notches into the z flashing on both ends where the flashing bends using the tin snips.
This allows you to bend the center part of the flashing over the sides of the door to cover the.
How to install t1 11 siding duration.
Test the rotted area of the t1 11 siding by poking it with a nail or a screwdriver.
Begin at either end of the wall and set the level middle.
Counter flashing drip or weep stucco screed over a z flashing duration.
Typically the z strip is placed on top of the bottom piece of siding then the next row of siding is placed on top of the z strip.
Scrape loose paint off the rotted area with a putty knife and use 80 grit sandpaper to smooth the rough surface if.