Give the panels plenty of support and don t let them sag for 8 foot panels two stickers are enough but for 12 to 16 foot panels use three stickers.
Installing siding on sip panels.
Sip homes are built every day and every single sip home has siding.
The panels slip over a wall plate which needs to be set half an inch from the building edge to ensure that the panels are fully supported.
Typical installation is done with galvanized ring shank nails.
Sips need to be fully supported during installation.
If you have any doubts about a particular type of siding contact a the sip manufacturer and b the siding manufacturer to verify that the products will work.
This portion covers the steps we.
It protects the sheathing from rain snow and pests.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Use the wider starter strip.
For longer panels don t go more than 6 or 8 feet between stickers.
Align and attach the panels at the corner.
This will create an air space over your panels which will allow them dry out if moisture escapes.
Also make sure to set the panels in place in order start in the corners or valleys and work outward.
The panels are then attached with big sips screws through the longer panel just inside the dimensional lumber placed in the corner and into the dimensional lumber in the second panel.
Lay panels flat on stickers no closer than three inches to the ground.
One panel will run long and the other panel will butt up against the previous one.
This is part 3 of how to build a shed playhouse.
Below the top of the foundation but the lower the vinyl siding is installed the better.